FINAL ASPECT OF THE SYSTEM
NO ANCHORS  NEEDED
100%  WATERPROOFED .  FORGET ABOUT LEAKAGE WATER INSIDE TO PARKADE.
PRODUCTION ON SITE FOR THE CONCRETE PANELS. FOR DIFFICULT WEATHER, THIS PROCESS MAY DONE IN A WAREHOUSE.

PROPERTY LIMIT 
 NO PROBLEMS WITH PIPES, SEWAGE , GAS LINES ,OPTICAL FIBER OR MANY OTHERS. NEVER GO BEYOND THE PROPERTY LINE, YOU DON' HAVE TO FIGHT WITH YOUR NEGHBOUR ( PRIVATE OR PUBLIC )
JOINT OF PILE AND CONCRETE PANEL
WORKING ON A 100% COMPRESS STATEMENT. LIFE GUARANTEED
BACK SIDE OF SFS SYSTEM
GENERAL VIEW ( PILE, PANELS AND CONCRETE JOINT )
YOU  DON' NEED ANY FINAL ADITIONAL FINISHING MATERIAL.  100% MAINTENANCE FREE !!!
GENERAL VIEW (  DETAILS OF CONCRETE JOINT  WITH  PANELS AND PILES )
QUALITY CONTROL ASSURED FROM FACTORY
NICE  APPEARANCE  SINCE THE BEGINING.
100%  CAULKED.  100%  WATERPROOF.
FINAL FINISH OF SFS SYSTEM. 

( HIGH QUALITY FROM FACTORY )
PARKADE IN CALGARY CITY
 CONSTRUCTION  RETAINING WALL MADE USING SFS SYSTEM 
 APPEARANCE  BEFORE SLAB ON TOP
CLICK ON THE  NEXT SQUARE TO SEE THE VIDEO OF THE CONSTRUCTION PROCESS
 (  PLEASE WAIT SOME MINUTES TO LOAD IT  ) 
CRASH BARRIER PROTECTION ON HIGHWAYS

FINAL APPEARANCE WITH TRANSFER  SLAB.  MAINTENANCE FREE. NO ADITIONAL FINISHES NEEDED


NO OTHER FINISHES REQUIRED


RETAINING WALL 18' HEIGHT

CONCRETE BEAMS AND CONCRETE JOINTS ASSEMBLE , WORKING TOGETHER IN COMPRESS

USING THE SFS SYSTEM TO AVOID FLOODINGS


USING THE SFS SYSTEM AS RETAINING WALL FOR LINE 3 - MONTERREY SUBWAY SYSTEM . CLICK ON  ANY OF THE ABOVE SQUARES TO SEE A NARRATED PRESENTATION 

RESEARCH LAB. AND ANCHOR PROBLEMS WITH LEAKING WATER FROM SUBSOIL


SCHEMATIC ARRANGEMENT FOR SFS SYSTEM 

RETAINING WALL USING SFS SYSTEM  ( 40 FEET HIGHT )